1. The list view entity with type "event" does not have a dateStart, but it has a dateEnd.
2. The "small form" view is a drop-down action.
3. The dateStart is present in the small layout.
The event "startField changed" was fired, and as a result, the dateEnd was recalculated. This occurred outside of the edit mode.
If add startDate in the list layout or remove duration from the small detail layout all ok
2. The "small form" view is a drop-down action.
3. The dateStart is present in the small layout.
The event "startField changed" was fired, and as a result, the dateEnd was recalculated. This occurred outside of the edit mode.
If add startDate in the list layout or remove duration from the small detail layout all ok
Comment